One showcase per region in Quebec, at preferential terms — is yours still open? Check my region

LL-TEQ™ · Solutions

LL-TEQ Solutions / Resurfacing

Renew the running surface and restore the profiles — without full reconstruction, at a fraction of mill-and-pave cost.

Request a quote

The problem

The street still carries — but the surface is done

Structurally sound, visibly done

The street still bears the load, but the surface is cracked, ravelled, uncomfortable — and complaints are piling up.

Mill-and-pave is expensive

Redoing the asphalt on entire streets mobilizes a plant, trucks, and budget — to replace a material that is still there, under your wheels.

Waiting makes it worse

Every freeze season turns surface defects into structural defects. The cost of delay is exponential.

The LL-TEQ solution

LL30 at moderate depth, LL25 as the sealed wearing course

The existing surface material is mixed with the LL30 binder at moderate depth, regraded, compacted, then sealed with LL25. The street regains a profile, cohesion, and imperviousness — recycling in place what is already there.

Cracked street before LL-TEQ resurfacing

The frame

What's included — and what isn't

Included in the LL-TEQ solution

  • Site visit and design data collection
  • Project-specific specifications and execution procedures
  • Project-tailored formulation and loading, produced after quote acceptance
  • Coordinated delivery and technical briefing of operators (LL-TEQ SOPs)
  • LL-TEQ / Landlock technicians present at every stage
  • End-of-site technical report and return-to-service recommendation

Done by the contractor or the client

  • Execution of the works with their own equipment
  • Signage and traffic management
  • Access control during curing
  • Permits and authorizations
  • Drainage works and marking

LL-TEQ is not a general or specialized contractor under the Building Act (CQLR, c. B-1.1) and holds no RBQ licence. A certificate of authenticity and product compliance, issued by the manufacturer, is provided.

The price

How the price is set

Every solution is quoted per m². The price follows from the loading design: the treatment depth and the product charge per m², set by our engineering design for your project. No published figure replaces a design — every quote is generated per project.

Environment

Recycling the road in place is also a carbon story

≈ 9.6 kg CO₂e/m²

vs ≈ 55 kg CO₂e/m² for an asphalt reconstruction — approximate calculation, internal ref. PRV-06.

Material recycled in place

The existing pavement becomes the new structure: no mass excavation, no granular hauling, no asphalt plant.

Non-toxic runoff

Acute toxicity testing on simulated runoff water: no acute toxicity observed (EPA methods 2000.0 / 2002.0, Coastal Bioanalysts, 2013). No soil contamination and no alkalinization.

FAQ

Frequently asked questions

What's the difference with structural reclamation?

It's the depth. Resurfacing treats the wearing course of a street that still bears the load; structural reclamation re-treats the entire structure (100–200 mm) of an end-of-life pavement. See structural reclamation

When does it reopen to traffic?

The LL25 seal follows final compaction; reopening to traffic is the subject of a written recommendation depending on site conditions.

What about isolated potholes?

For spot repairs without a resurfacing project, the LL-TEQ pothole kit covers 300 to 400 m² of repairs per kit — see the Products page.

Streets to renew without rebuilding everything?

Tell us about your site — we come back with a design and a per-m² quote.

Request a quote The LL30 / LL25 technology