One showcase per region in Quebec, at preferential terms — is yours still open? Check my region

LL-TEQ™ Card

Why LL-TEQ

The evidence behind the claims: installation speed, structural proof, and the science that makes it all work.

The science behind LL-TEQ

Cost, speed, strength, and science — all documented

Cost & ROI

Fewer trucks and less fuel on site, no asphalt-plant dependency — actual project economics are confirmed at the bid stage.

Installation

Five clear steps. Standard equipment. Over 2 km/day of complete 2-lane rebuild. Open to traffic from 12 hours depending on conditions. No plant, no heating, no imports.

Proven Technology

Tested per ASTM C39 (PSI), ASTM D5084 (permeability), AASHTO T-324 (rutting), EPA Methods 2000.0/2002.0 (acute toxicity). Used by the U.S. Marine Corps and Air Force. Field case studies 2012–2024.

The Science Behind LL-TEQ

Vinyl-acrylic polymer emulsion, mixed into the existing soil, cured by evaporation — a cold workflow that produces a hardened bound layer instead of a floating surface.

Documentation

Technical briefs, standards references, and project documentation available for qualified stakeholders.

LL-TEQ performance and technology

Proven Performance

1,625 PSI · MULTI-CONTINENT · FIELD DATA 2012–2024

Tested per ASTM and AASHTO protocols by accredited independent laboratories. Validated by the U.S. military. Deployed globally in civil, industrial, and strategic infrastructure.

Request Technical Documentation